The show will feature displays of new and pre-owned vehicles, trucks, motorcycles, classic and custom-built cars, auto accessories, finance and insurance solutions, as well as live stunt performances, drifting, gymkhana, road safety demonstrations and family entertainment.
“Once completed, the project is expected to significantly reduce power outages and unplanned power failures on both the Nkenda–Ishaka and Nkenda–Kasese 33kV feeders. The upgraded network will also enable the efficient evacuation of electricity generated by hydropower plants within the Rwenzori region,” Okochi said.
Under World Health Organization (WHO) guidelines, the discharge of the final patient begins a mandatory 42-day countdown before Uganda can officially be declared free of the Ebola outbreak, provided no new confirmed cases are detected during that period. The 42-day period represents twice the maximum incubation period of the Ebola virus and is the international standard for declaring the end of an outbreak.
The President assured investors that Uganda has adequate raw materials to sustain the factory, noting that the challenge lies in organising farmers and connecting them to dependable markets rather than increasing production.
“According to World Health Organization, stunting has a lifelong consequence. Children who are stunted are more likely to experience failure to reach their physical potential,” Akena said.
Chaplain Colonel Forster described religion as a “center of gravity” for stability in Africa, where chaplains play a unique role in instilling values and fostering pluralism.
“I call upon members who have challenges in the party and those with different views to attend the retreat to present all their views and challenges. Here we dont fear different views because we have the brains to resolve issues,” Mao said.